Starter Kit (Level Four) Model: SK50
Utilizes the MCD01 main clamping device together with the TD01 truing device for fast, vertical loading. Provides Gaiser three point truing and can be preset at a truing station.
- 1 ea. R200 Rail *
- 1 ea. MCD01 Main Clamping Device
- 1 ea. TD01 Truing Device
- 1 ea. V06 Six Inch Vise (2 inserts)
(V06 can be substituted with other holders at a price difference)
* Click here for information on ordering rails